• Establish site horizonal and vertical control
  • Pre-pour foundation checkouts
  • Construction staking
  • As-built drawings and spread sheets for turn over packages
  • Cross-sections
  • Topographic survey and quantity reports
  • Pipe tie ins
  • Many other related tasks